No products in the cart.
Original price was: $29.00.$17.40Current price is: $17.40.
Guidelines and Guide Specifications for Using Pozzolanic Stabilized Mixture (Base Course or Subbase) and Fly Ash for In-Place Subgrade Soil Modifications
Published by | Publication Date | Number of Pages |
AASHTO | 01/01/1990 | 56 |
Description
AASHTO TF28-1 – Guidelines and Guide Specifications for Using Pozzolanic Stabilized Mixture (Base Course or Subbase) and Fly Ash for In-Place Subgrade Soil Modifications
Contains the following subsections:
- Guidelines for Usage of Pozzolanic Stabilized Mixture (PSM) Base Course or Subbase,
- Guide Specification for Pozzolanic Stabilized Mixture (PSM) Base Course or Subbase,
- Guidelines for Use of Fly Ash for In-Place Subgrade Soil Modification,
- and General Contract Specifications for Acceptance of Fly Ash by a State Highway Agency.
Product Details
- Published:
- 01/01/1990
- Number of Pages:
- 56
- File Size:
- 1 file , 2.3 MB
- Note:
- This product is unavailable in Russia, Belarus