No products in the cart.
Original price was: $61.00.$36.60Current price is: $36.60.
Control of Forgings Requiring First Article Approval
standard by SAE International, 04/09/2012
Description
This specification covers procedures for obtaining first-article (preproduction) approval of forgings and the controls to be exercised in producing subsequent production forgings.This procedure has been used typically for forgings which require preproduction approval and where assurance is required that production lots are of essentially the same metallurgical quality and are produced by the same basic procedures as the forging originally qualified.
Product Details
- Published:
- 04/09/2012
- File Size:
- 1 file , 720 KB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus