SAE AIR5416

Original price was: $128.00.Current price is: $76.80.

Maintenance Life Cycle Cost Model
standard by SAE International, 10/13/2016

Category:

Description

SAE AIR5416 – Maintenance Life Cycle Cost Model

This document describes a life cycle cost model for commercial aircraft composite structure. The term life cycle cost used herein, refers to the airline costs for maintenance, spares support, fuel, repair material and labor associated with composites after introduction into service and throughout its useful life. This document contains the equations that can be programmed into software which is used to estimate the total cost of ownership aircraft, including structure. Modification costs and operating costs are estimated over a specified life (any period up to 30 years). Modification costs include spares holding, training, support equipment, and other system related costs. Annual operating costs include: Schedule interruption, fuel, spares, insurance, and maintenance. Maintenance costs are separated by scheduled maintenance or unscheduled damage, or can by grouped into the typical organizations of line, shop, and hangar maintenance. This Lifecycle Cost allows users to evaluate the impact of Service Bulletins, potential design changes, changes in maintenance programs, or effectiveness of maintenance operations.

Product Details

Published:
10/13/2016
File Size:
1 file , 630 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus